It's one of the most common questions we hear from customers building a new EV charger quote: should solar go in at the same time, or later?
Get an instant price for thisIt's one of the most common questions we hear from customers building a new EV charger quote: should solar go in at the same time, or later? The short answer is that combining the two projects usually makes sense, but there are switchboard capacity and sequencing details worth understanding before you commit to doing both at once.
Why combining the projects makes sense
Both a solar installation and an EV charger installation touch the same parts of your house — the switchboard, the meter box, and often the same run of conduit to the garage or carpark. Booking one electrician for a single combined job typically saves a callout fee and a chunk of labour compared with two separate site visits months apart. Scaffolding for the roof (if needed) and any trenching for cabling can also be shared across both jobs rather than paid for twice.
The switchboard capacity question
This is the part most homeowners don't think about until an electrician raises it. Your main switchboard has a maximum current rating, and both a solar inverter feeding power in and an EV charger drawing power out need to fit within that rating alongside your existing household load. A typical NZ home has a 63A or 100A main fuse from the network; adding a 7kW single-phase EV charger (around 32A) on top of an existing 5kW solar inverter and normal household draw can get close to that ceiling on a cold winter evening when everything is running at once.
In practice this usually means one of three outcomes:
- Straightforward addition — your existing board and main fuse have enough headroom for both, common in newer homes with modern boards.
- Load management required — a device that automatically reduces EV charging current when household demand spikes, keeping total draw under the main fuse rating.
- Board upgrade needed — an older board or undersized main fuse may need upgrading before either system can be added safely, adding cost but a one-off fix that covers both installations.
Notification and approval requirements
Your electrician needs to notify your local lines company for both a solar installation (because it can export power back to the grid) and, in some areas, for a high-draw EV charger circuit. Combining the applications into one notification is generally simpler than lodging two separate ones, and most electricians experienced in EV and solar work will handle this as part of the quote rather than treating it as an extra step.
Sequencing: solar first, charger first, or together
If your budget allows, doing both in the same visit is the cleanest approach — one design process, one set of cabling decisions, one inspection. If you're staging the spend, solar first followed by an EV charger later is the more common order, since it lets the electrician design the switchboard and load management with the EV charger already accounted for, even if it's added six or twelve months later. Adding solar after an EV charger is also fine, but occasionally means revisiting the load calculation the original charger installation didn't need to consider.
Dynamic load management and solar-aware chargers
Several EV chargers sold in NZ now include a solar-diversion or dynamic load management mode, automatically ramping charging current up when your panels are generating surplus power and down when household demand rises or the sun goes behind cloud. This only works well when solar and the charger are commissioned together or by an installer who configures both systems to talk to each other — a charger fitted in isolation months before solar arrives may need a firmware update or a smart meter add-on later to unlock this feature.
Single-phase versus three-phase properties
Most standard NZ homes run single-phase power, which comfortably supports a 7kW EV charger and a modest solar array without major upgrades. If you're planning a larger solar system plus a faster 11kW or 22kW three-phase EV charger on the same property, the calculation changes considerably — three-phase supply may need arranging with your lines company if it isn't already present, which can take several months in areas where the network needs to schedule the upgrade. Get this assessed early, since it can affect your project timeline more than either installation itself.
Notification thresholds worth knowing
Small residential solar systems, generally under 10kW, typically only require notification to your local lines company rather than a lengthier approval process, and most installers handle this as a routine part of the job. Larger combined systems sometimes cross thresholds that trigger a more detailed network assessment — worth asking your installer directly which side of that line your setup sits on, since it affects how quickly the whole project can be completed.
Rough combined cost
| Setup | Approx. installed cost |
|---|---|
| 6kW solar + basic single-phase 7kW EV charger, one visit | $17,500–$23,000 |
| Same setup with load management device included | $19,500–$25,500 |
| Board upgrade required first | Add $900–$1,800 |
| Two separate installations (solar now, charger 6+ months later) | Add roughly $700–$1,100 in duplicate callout and commissioning costs |
Figures assume a standard single-phase suburban Auckland property with reasonable roof access; three-phase properties and difficult cable runs will vary.
Our practical advice
If you're planning to get an EV at some point and are already having solar quoted, ask the installer to size the switchboard and inverter setup with a future EV charger in mind, even if you're not installing the charger circuit itself yet. It costs very little extra at quoting stage and avoids a second, more expensive load calculation exercise later. If you already own the EV, doing both now — with load management included — is generally the more cost-effective and technically cleaner path than staggering the two projects.